The development and construction of a 3-phase d.c. stabilised electric arc plasma furnace for fundamental glass melting studies is described. An FTIR spectrometer is used to record spectral data from the hot plasma melting zone during both batch feeding and static crucible melting.
Origin
British Glass
Journal Title
Proc Conf Plasma For Industry And Environment, Oxford, 25-27 Sept 1990
Sector
General
Class
G 621