The design and construction of a gas-fired cullet preheater are described. A theoretical example given is that preheating cullet on a 180 tonnes/day container furnace could increase the pull to 234 tonnes/day.
Origin
Tecogen Inc
Journal Title
Ceramic Engng Sci Proc 1988 9 3-4 264-272
Sector
Container glass
Class
C 140