Furnaces For Glass Melting: The Future Route In The Design And Construction Of Glass-Melting Furnaces (Italian)

A 200 tonnes/day furnace using natural gas and electric boost to reduce pollution is described briefly.

Author
A Grob
Origin
Glashuttentechnik Grob Gmbh
Journal Title
Vetro Informazione January-February 1989 49 47-48
Sector
General
Class
G 252

Request article (free for British Glass members)

Furnaces For Glass Melting: The Future Route In The Design And Construction Of Glass-Melting Furnaces (Italian)
Vetro Informazione January-February 1989 49 47-48
G 252
Are you a member?
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.
2 + 4 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.